Back Pause Forward
 
 
CONTACTS:
Michael Joachim
Director, Plants Department
17A Marlen Drive
Hamilton, NJ 08691
Tele: (609) 586-8004
Cell: (609) 516-9107
MichaelJ@ippe.com
Sanjeev Rege
Vice President Global Plant Sales
17A Marlen Drive
Hamilton, NJ 08691
Tele: (609) 586-8004
Cell: (609) 510-2616
SanjeevR@ippe.com
Narendra Vaswani
Sales Manager, Far East
83/A, Tagor Nagar Society Old Padra Road
Baroda, Gujarat 390015
India
Tele: 91-265-2341057
Cell: 91-98250-64345
Fax: 91-265-2341057
NarendraV@ippe.com
 
Register  Login
  You are here:  Plant SearchPlant Detail   
Acrylic Fiber Plant-25,800 MTPY
Stock Number: 600008
Capacity: 25,800 MTPY
Status: Available
Technology: Asahi
Raw Material: Acrylic Fiber Plant
Products Produced:
Continuous Acrylic Fiber (Tow), Cut Fiber (Staple)
Brief Overview:
Asahi designed continuous acrylic fiber plant. Produces both tow and staple fibers.
Process Description:

Polymerization of feed material takes place in reactor vessels with pure water. The resulting polymer is purified, dried and stored in preparation for dissolving in a concentrated solution of nitric acid. The "dope" liquid formed is then cooled, filtered, and de-aerated in preparation for spinning

The dissolved Polymer is extruded through Spinnerettes in a strong solution of nitric acid. Spinnerettes are a stainless steel unit with many thousands of small holes. As the Polymer emerges from the holes it coagulates to form fiber filaments. The solution of nitric acid mixes with a water solution which is pumped continuously around the spinning baths in which the spinning process takes place. Once the filaments are formed they are carried on to be washed clean of the remaining nitric acid.

The fiber is then stretched to improve its strength and to transform it to a more "wool" like product. Two separate drying and oiling processes are carried out to improve the anti-static properties and the process ability of the fiber. The fiber is then set by steam heating to an exact temperature for a controlled time period. This standardizes the dimensional stability and the dyeability of the fiber so that color is guaranteed during downstream dying.

The tow, which is a "rope" like fiber, is packed into bales. Stable fiber is soft crimped and then cut to selected lengths before baling.

Major Equipment:

Please call Michael Joachim or Sanjeev Rege in our Plants Department today for an updated equipment list.


Copyright 2002-2010 International Process Plants   Terms Of Use  Privacy Statement   
Bookmark and Share

Follow Us On Twitter

Print Pageprint this page
Print Pageemail this page