The Plant was originally designed and built in 1986 for a capacity of 100,000 MTPY of High Density Polythylene, "HDPE". The reactor itself is oversized and has a much larger capacity.
The production has been increased to 120,000 TPY only by optimizing the process conditions rather than adding equipment or upgrading the reactor.
Plant was operating and running at 110,000 TPY capacity inn line with the demand in that area prior to shutdown.
Click Here for Power Point Presentation