Capacity: 110,000 metric tons/year (2) lines producing 55,000 metric tons/year each (A line and B line)
Built 1996/1997
(1) Crsytallizer to start the process which discharges into (2) different processing lines A & B. Both A and B lines produces 55,000 metric tons/year each.
Click Here to View the SSP3 Flow Diagram