| |
| |
Melamine and Urea Facility Includes |
|
|
| |
 |
|
(2) Melamine Lines: 90 tpd total |
|
| |
|
|
30 tpd Line (stock #600463)
60 tpd Line (stock #600499)
|
|
|
| |
 |
|
(1) Urea Plant: 500 tpd (stock #600500) |
|
|
| |
Complete Melamine and Urea Facility Details |
|
|
| |
|
|
Both the melamine and urea plants were operated until 2007 |
|
|
| |
|
|
Urea is used as a raw material (fed to the melamine lines) and a small quantity of ammonia is required |
|
|
| |
 |
|
Complete melamine production capacity is 90 tons/day |
|
|
| |
|
|
Complete melamine and urea facility design includes an urea plant integrated with (2) production lines of melamine |
|
|
| |
|
|
First line produces 30 tons/day
Second Line produces 60 tons/day (difference is due to a smaller stripping column in the first production line)
|
|
|
| |
|
|
Urea production capacity is 500 tons/day in a water solution at 70% concentration, starting with imported ammonia and CO2 as raw materials. |
|
|
| |
|
|
All melamine and urea equipment have been continuously maintained during operations. |
|
|
| |
|
|
Both melamine and urea plants were managed via DCS control system |
|
|
| |
|
|
Technical documentation for both the melamine and urea plants are available. |
|
| |
|
|
|
|