Amines Plant-27,000 BPD 27,000 BPD
The new Amine Unit removes CO2 from ethane with the Amine Contactor, V‐351. Diglycolamine (DGA) is the selected amine because of its ability to remove secondary contaminants COS and H2S. DGA use allows the current COS...
HYCO -4,000 Nm3/hr CO, 20,000 Nm3/hr Hydrogen 4,000 Nm3/hr CO, 20,000 Nm3/hr Hydrogen
Hydrogenation Buss Loop Reactor System-2.9 CuM 2.9 M3 Reactor
Designed by Buss, Built 1989, operated only 3 months due to business conditions
8 m x 10 x 9 m high, modular system Buss Loop Reactor System
LNG-415 TPD 415 TPD
UNUSED 415 T/d LNG plant available for sale
This plant is based on process design and equipment structure design, it considers sufficiently the plant safety, reliability and advancement, meanwhile it is easy to operate and ...
Refinery - 200,000 BPD 200,000 BPD
Distillation Units:
Treating Units:
GET IN TOUCH
Call us at (609) 586-8004 or CONTACT US