PreviousPlay/PauseNext




email this page printer-friendly version

175 TPD Ammonia Plant

Brief Overview
 

Capacity:

 

175 metric tons/day

Technology:

 

VOEST Alpine (Austria)

Built:

 

1984
 

Shut Down:

 

1990
 

Raw Materials:

 

Naphta

Products Produced:

 

Liquid anhydrous ammonia

Documentation:

 

Available
 


Process Description

  • Similar to ICI process.
  • Naphta desulfurisation ( s < 0.2 ppm)
  • Primary reforming with water vapour
  • Secondary reforming with air
  • Conversion of carbon monoxyde by Monoéthanolanium
  • Elimination of carbon dioxyde
  • Méthanation by réaction of hydrogen with CO & CO² using CCI catalytic bed (type C–14–4–03 )
  • Compression : By two Ingersoll-Rand compressors powered by a 3 MW synchronous motor with 6.000 volts supply voltage


Darwin Rianto
© Darwin Rianto