PreviousPlay/PauseNext




email this page printer-friendly version

Power Station 350 MW

Brief Overview

The buildings have an internal area of 45,000 sqft and are positioned centrally on the site.

Capacity:

 

2 generating units of 350 MW each
 

Technology:

 

Coal-fired

Shut Down:

 

2003
 

Major Upgrades:

 

- Flue gas dust abatement equipment upgrade.
- Electrostatic Precipitators (ESP) internals replacement
- New fly ash collection and transportation equipment installation
 

Documentation:

 

Available
 

Major Equipment:

 

- Two 350MW conventional boilers.
- Two prototype 375MW supercritical units.
- To this date, the plant consists of 8 factory buildings


© Darwin Rianto